The airport was experiencing the process of expansion and development which began in 2004 and planned for completion in 2009. Between the part of the development is a new passenger terminal with a capacity of 7 million passengers per year, apron (aircraft parking area) with a capacity of seven wide-bodied aircraft, the new runway along the 3100 meters x 45 meters, and the taxiway. Operation of the new terminal began on August 4, 2008 by using a long runway for a new runway was still under way. Now, Sultan Hasanuddin International Airport Apron Already Operate new, new runways and a taxiway fruit.
Showing posts with label Accomodation. Show all posts
Showing posts with label Accomodation. Show all posts
The airport was experiencing the process of expansion and development which began in 2004 and planned for completion in 2009. Between the part of the development is a new passenger terminal with a capacity of 7 million passengers per year, apron (aircraft parking area) with a capacity of seven wide-bodied aircraft, the new runway along the 3100 meters x 45 meters, and the taxiway. Operation of the new terminal began on August 4, 2008 by using a long runway for a new runway was still under way. Now, Sultan Hasanuddin International Airport Apron Already Operate new, new runways and a taxiway fruit.
Subscribe to:
Posts (Atom)