The airport was experiencing the process of expansion and development which began in 2004 and planned for completion in 2009. Between the part of the development is a new passenger terminal with a capacity of 7 million passengers per year, apron (aircraft parking area) with a capacity of seven wide-bodied aircraft, the new runway along the 3100 meters x 45 meters, and the taxiway. Operation of the new terminal began on August 4, 2008 by using a long runway for a new runway was still under way. Now, Sultan Hasanuddin International Airport Apron Already Operate new, new runways and a taxiway fruit.
The airport was experiencing the process of expansion and development which began in 2004 and planned for completion in 2009. Between the part of the development is a new passenger terminal with a capacity of 7 million passengers per year, apron (aircraft parking area) with a capacity of seven wide-bodied aircraft, the new runway along the 3100 meters x 45 meters, and the taxiway. Operation of the new terminal began on August 4, 2008 by using a long runway for a new runway was still under way. Now, Sultan Hasanuddin International Airport Apron Already Operate new, new runways and a taxiway fruit.
National park was designated a conservation area or national park based on the Minister of Forestry Number: SK.398/Menhut-II/2004 dated October 18, 2004. Currently managed by the Park Bantimurung Bulusaraung, based in Bantimurung, Maros, South Sulawesi.
Subscribe to:
Posts (Atom)